Critical Path
“The engineering journey to Starship and beyond.”
Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.
- Status
- Veröffentlicht
- Veröffentlichung
- 10/07/2026
- Originalsprache
- Englisch
Hauptbesetzung
Bilder





Das könnte dir auch gefallen
Der Astronaut – Project Hail Mary
2026
The Dark Knight
2008
Resident Evil: Noche cero
2026
Die Odyssee
2026
Eiserne Wildnis – Heart of the Beast
2026
Apokalypse Z - Neue Welt
2026
Spider-Man: Un nuevo día
2026
Hope
2026
Una historia de Derry
2026
Das Hotel New Hampshire
1984
Coco - Lebendiger als das Leben!
2017
La Mangosta
2026








