Trailer non ancora disponibile
Film

Critical Path

2026 34 min
100%
Voto del pubblico1 voti su TMDB

“The engineering journey to Starship and beyond.”

Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.

Stato
Uscito
Data di uscita
10/07/2026
Lingua originale
Inglese

Cast principale

Immagini

Potrebbe piacerti anche